Page 6 New Room

 __________________________________________________________________

Home
Design Index
Hooping Video
Pattern Maker Videos
Scallops Video
Tissue Box Video
Split Designs CD
Split Designs
New Room
Northern Lights
Order Info
My Projects
Pillowcase
Guest Projects
Links
Contact Murphy
Tips and Tricks
Latest Newsletter
Splits Confirmation

 

Please allow extra time for page to load - lots of pictures!

 
Here is the west end of the house.  The days are getting much shorter now and the weather has been much colder.  You can see that most of the leaves are gone.
The bow window is all in and now the siding is back on the house.
Steve put a door into the room.  This where the fireplace used to be.  You can sort of see the cold air returns for the upstairs and the new room.  They are near the top behind the ladder.  The runs go along the wall down into the basement.
Here are the light cans for the ceiling.  They got those put in and the wiring started.
There are lots of outlets in the room.  I want them to be up above my working areas so that I can access them easily.  
Here is Steve working on the wiring for under some of the windows.  Yes, you see 6 boxes here, Coral.  There is going to be a counter here and a lot of equipment plugged in.  Coral wrote and told me to make sure they put in enough outlets for the electricity.  I think we have enough.
Here they have the insulation partially on the walls and the ceiling and wall planking is going in.  The peak of the ceiling is 12 foot and the side walls are 9 foot.
Here they put up the sheets of insulation for the ceiling and more in the wall.  Lots of stacks of the planking.
Here is Bob in front of the windows on the west end.  They got the one trapezoid window on the right done and ready for the second one.
They had to use scaffolding on the outside of the house so they could get the windows up to the top where they belong.

More to come ....

Click here to go directly to Page 1.

Click here to go directly to Page 2.

Click here to go directly to Page 3.

Click here to go directly to Page 4.

Click here to go directly to Page 5.

Click here to go directly to Page 7.

Click here to go directly to Page 8.

Click here to go directly to Page 9.

Page 9 has the start of final pictures!

Click here to go directly to Page 10.

Click here to go directly to Page 11.

Click here to go directly to Page 12.-large pictures

Click here to go directly to Blinds Page

Updated December 10, 2003

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

All auto download designs must be downloaded within 48 hours!  Please don't delay after you order.  Auto download is not available for Split Designs.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Make your credit card payments with PayPal - click on this button.

__________________________

 

 

~~~~~~~~~~~~~~~~~~~

If you would like to learn how to stitch out split designs,

click here to find out more on how to get your copy of my Hooping Video.

_____________________________________________

Click the mailbox to send me an email message.

 

Copyright © 2000- 2008  Marian Ecker

 

All site pages, pictures and designs copyright Murphy's Designs - "Murphy" Marian Ecker - all rights reserved

Embroidery Library pictures used with permission.